The database contains around 80  key developments projects in INTSOK's main and emerging markets. The projects are followed from an appraisal phase to contract awards. Project data may be sorted and searched by the criteria below.

Country Name Dev. Phase Operators
Angola Chissonga (16.05.13)
Subsea trees tied back to an FPSO, with an additional tension leg wellhead platform also now being considered.
FEED Maersk Oil and Gas
Australia Ichthys (15.05.13)
Mega project - Includes Semi FPU with subsea tiebacks, FPSO and pipeline to onshore LNG processing plant and export facilities.
Execute Inpex
Australia Wheatstone Project (15.05.13)
Mega project - Includes fixed platforms, subsea development and tieback to land LNG processing plant and export facilities.
Execution Chevron
Australia Bonaparte FLNG (15.05.13)
Subsea and FLNG export
Pre-FEED GDF Suez
Australia Equus Project (15.05.13)
Subsea and Semi-FPS, subsea pipeline export to shore
FEED Hess
Australia Sunrise (14.05.13)
Subsea and FLNG export
Pre-FEED Woodside
Australia Prelude Project (14.05.13)
Subsea and FLNG export
Execution Shell
Kazakhstan Tengiz (14.05.13)
   
Brazil Eight Pre-salt FPSOs (Lula, Iara, Carcara fields) (19.04.13)
Eight identical 150,000 b/d FPSOs, connected to subsea wells.
Tendering/Under Construction Petrobras
Brazil Atlanta (19.04.13)
FPSO with subsea wells
Tendering Queiroz Galvao Exploration & Production (QGEP)
Brazil Peregrino Phase II (19.04.13)
One wellhead platform, connected by pipeline to the Phase I Peregrino FPSO
FEED Statoil
Brazil Carioca (19.04.13)
One leased FPSO connected to subsea wells
FEED Petrobras
Brazil Cernambi (formerly Iracema) (19.04.13)
Two leased 150,000 b/d FPSOs (one in the southern part of the field and one in the northern), connected to subsea trees s
Tendering/Under Construction Petrobras
Brazil Transfer of Rights Area Phase I (Franco, Nordeste de Tupi) (19.04.13)
Four converted 150,000 b/d FPSOs connected to subsea wells
Four converted 150,000 b/d FPSOs connected to subsea wells Petrobras
Nigeria Zabazaba/Etan (08.04.13)
Around 25 subsea trees tied back to an FPSO with processing capacity of 180,000 b/d. Also CALM buoy plus 130km gas export line to shore.
FEED Eni
Nigeria Bonga North (08.04.13)
Stand-alone FPSO development.
Conceptual Shell Petroleum Development Company of Nigeria Limited (SPDC)
Nigeria Bosi (08.04.13)
FPSO and subsea trees
Conceptual ExxonMobil
Nigeria Egina (08.04.13)
Subsea and FPSO.
EPIC tendering. Total
Angola Pazflor (Zinia) Phase 2 (08.04.13)
Subsea tie-back
Conceptual/FEED Total
Angola Malange (08.04.13)
Subsea tie-back to Tombua Landana
FEED Chevron
Angola Kizomba Satellites Phase II (08.04.13)
Subsea trees attached to the Mondo (Kizomba C) and Kizomba B FPSOs. Key Contractors: AMEC, Saipem, GE Vetco Gray, Oceaneering, DOF Subsea.
FEED Exxon Mobil
Angola Block 31 Phase II (08.04.13)
Subsea trees tied back to FPSO
Under development BP
Angola Lucapa (08.04.13)
Subsea & FPSO
FEED Chevron
Angola Gabela (08.04.13)
Conceptual studies  
Angola Block 14: Lianzi (08.04.13)
Subsea
Under Construction Chevron
Angola Negage (08.04.13)
Subsea tie-back to Tombua Landana likely.
Conceptual studies Chevron (aka Cabinda Gulf)
Angola Block 18 West (08.04.13)
Subsea trees tied back to an FPSO, possibly a leased unit.
FEED BP
Angola Block 15: East Hub (08.04.13)
25 subsea trees tied back to an FPSO, possibly a leased unit, with a capacity of 80,000 b/d.
Feed Eni
Angola Kaombo (08.04.13)
Up to 66 subsea trees tied back to two FPSOs with a production capacity of 200,000 b/d in total.
FEED Total
UK Greater Lancaster Area (GLA) (08.04.13)
An FPSO project, with a phased development of up to 11 subsea wells as part of the Greater Lancaster Area (GLA) concept.
Conceptual Hurricane Exploration
India KG-D6 (08.04.13)
Subsea. Existing fields D-1 and D-3, which started production in 2002, have an offshore platform and an onshore gas plant. The neighbouring MA field, which started later in May 2009, has six wells which are tied into the FPSO Dhirubhai-1 for gas storage and export. New developments in the satellite fields of D-2, D-6, D-19, D-22, and also in the R-series field (D-34) will have subsea wells tied back to existing D-1/D-3 infrastructure.
Conceptual Reliance Industries
UK Catcher (02.04.13)
FPSO with subsea trees most likely.
Conceptual Premier Oil
UK Kraken (02.04.13)
Leased FPSO plus around 25 subsea trees
Tendering EnQuest
UK Rosebank (02.04.13)
Subsea trees linked to newbuild FPSO with a gas export line to shore.
FEED Chevron
UK Bressay (02.04.13)
A PDQ platform and floating storage unit (FSU) development is expected.
FEED Statoil
UK Mariner (02.04.13)
Platform and floating storage unit (FSU).
FEED Statoil
USA (Gulf of Mexico) Vicksburg (02.04.13)
potential subsea tie-back to Appomattox discovery
  Shell
USA (Gulf of Mexico) Vito (02.04.13)
Undecided; potential FPS-based solution.
  Shell
USA (Gulf of Mexico) Stones (02.04.13)
FPSO & subsea.
FEED Shell
USA (Gulf of Mexico) Appomattox (02.04.13)
Potential floating production facility/hub.
Conceptual, Pre-FEED Shell
USA (Gulf of Mexico) Cascade/Chinook Phase II & III (02.04.13)
Phased development with FPSO and subsea
  Petrobras
USA (Gulf of Mexico) Gunflint/ Freedom (02.04.13)
Undecided - likely stand-alone facility with subsea
Conceptual Noble Energy
USA (Gulf of Mexico) Julia (02.04.13)
Subsea tie-back
Feed ExxonMobil
USA (Gulf of Mexico) Heidelberg (23.03.13)
Spar-based solution
Under Construction Anadarko
USA (Gulf of Mexico) Shenandoah (23.03.13)
Potential production hub
Conceptual Anadarko
USA (Gulf of Mexico) Buckskin/Moccasin (23.03.13)
Likely floating production facility/hub
  Chevron
USA (Gulf of Mexico) Hadrian North (22.03.13)
Semisubmersible production platform
Conceptual ExxonMobil
USA (Gulf of Mexico) Tiber (22.03.13)
Undecided; FPS-based solution likely
Conseptual BP
USA (Gulf of Mexico) Kaskida (22.03.13)
Undecided; FPS-based solution likely
Conceptual BP
Kazakhstan Kashagan (27.02.13)
Artificial island hubs with offshore drilling, production, processing facilities and onshore terminal for further processing, storage and export of oil.
Under development Agip KCO (until Jan-22-2009) - Phase I, NCOC (after Jan-22-2009)- Phase II
Kazakhstan Karachaganak (27.02.13)
Onshore operations include completion, refurbishment and improvement of existing condensate and gas facilities, construction of new facilities.
In production (Phase II M - Maintenance); further expansion (Phase III) is being evaluated Karachaganak Integrated Organization (KIO): Agip (Italy) 32.5 % BG (U.K.) 32.5 % Chevron (U.S.) 20 % Lukoil (Russia) 15 %
China CNOOC LiuHua19-5 (11.01.13)
Subsea Gas Field tieback to Fixed platform PanYu30-1 DPP
Under Development CNOOC ShenZhen Ltd..
China CNOOC HuangYan (HY) gas fields project (09.01.13)
Fixed jacket platform group with subsea pipeline and subsea cable connection
Basic Design for HY Phase II, Phase III and PingBei Phase I CNOOC 50% and Sinopec 50% CNOOC Shanghai Ltd.
China CNOOC HZ25-8/XJ24-1 Oil Field (09.01.13)
Fixed jacket platform with subsea pipeline and subsea cable connection
Basic Design CNOOC ShenZhen Ltd.
China CNOOC Liuhua 16-2 (09.01.13)
Subsea wells with TLP or Semi or deep water jacket platform tieback to FPSO
  CNOOC ShenZhen Ltd.
China CNOOC EnPing 24-2 & Enping 23-1 (08.01.13)
Fixed platform with single point mooring FPSO
Under Development CNOOC ShenZhen Ltd.
UK UKCS Update November 2012 (08.01.13)
   
China LiuHua 11-1 Oil Field Dev. Ad. (08.01.13)
Subsea Gas Field tieback to FPSO by Semi or TLP Or Deep Water jacket platform tieback to existing LH 11-1 FPSO "Nanhai Shengli"
Feasibility Study CNOOC ShenZhen Ltd.
China WeiZhou 6-12/12-8W Oil Field (08.01.13)
There are two (2) Fixed platforms with subsea pipeline connect to WZ12-8W PUQB central platform then through 32.5KM ,12"/18" subsea pipeline to WeiZhou Island onshore terminal, GuangDong province
Under Installation and Commissioning CNOOC Nanhai West Ltd.
Angola Block 31 Phase III (26.11.12)
Subsea trees tied back to FPSO, probably leased.
Conceptual BP
USA (Gulf of Mexico) Deep Blue (14.11.12)
Sub-commercial
N/A Noble Energy
USA (Gulf of Mexico) Pony /Knotty Head (14.11.12)
- Tension Leg Platform (TLP) based - Subsea - Pipelines
FEED HESS/Nexen
UK Western Isles (26.07.12)
Five production wells and four water injection wells in two eight-slot manifolds, tied back to an FPSO. Up to three additional exploration wells are also planned. A gas export line will also connect the FPSO to the Tern A platform, around 12km away.
Under Construction Dana Petroleum (subsidiary of KNOC)
China LS 36-1 (04.07.12)
Fixed platform with subsea pipeline tieback to onshore gas processing plant
Under Development CNOOC East Sea Ltd. (Shanghai) CNOOC 51%, UK Primeline 49%
China PanYu34-1/35-1/35-2 (02.07.12)
Subsea Gas Field tieback to fixed platform PanYu34-1, then through 31.3KM subsea multiphase pipeline tie back LiWan3-1 CEP
Under Development CNOOC ShenZhen Ltd. CNOOC Owned 100% Panyu34-1/35-1/35-2 project and managed by same "South China Sea Deep Water Project Team" with CNOOC LiWan3-1 project
UK Quad 204 (18.06.12)
   
Russia Shtokman Phase 2, 3 (27.02.12)
FPSO and subsea.
FEED "Gazprom Dobycha Shelf"
China CNOOC KenLi 3-2 Oil Field (18.01.12)
Total 7 Fixed platforms with subsea pipeline connect to KL3-2 CEPA central platform then through 80KM subsea pipeline to DongYing, ShangDong province on shore oil terminal
Basic Design will be done in May, 2012 CNOOC Bohai Ltd.
China LiWan 3-1 (16.01.12)
Subsea gas field in Deep water and tie back to shallow water fixed platform then through long gas pipeline to shore
Under development Husky Energy China for deepwater CNOOC ShenZhen Ltd. for shallow water and onshore gas receiving terminal Husky Energy operates the field and holds a 49% interest, and CNOOC holds the remaining 51% interest.
Russia Shtokman Phase - 1 (18.11.11)
Floating production unit and subsea
FEED Shtokman Development AG, for the first stage - 25 years, (Gazprom 51%, Total 25%, Statoil 24%)
Russia Vladimir Filanovsky Field (18.11.11)
Fixed platform
FEED Lukoil- Nizhnevolzhskneft
Tanzania North Idku (04.07.11)
Two platforms tied back to onshore processing plant
FEED RWE Dea
Egypt West Nile Delta Phases I & II (04.07.11)
Subsea trees tied back to newbuild onshore processing plant
pre-FEED BP
Saudi Arabia Wasit (04.07.11)
FEED  
United Arab Emirates Umm Al Lulu Phase I (04.07.11)
Platforms and pipelines
FEED ADMA-OPCO
United Arab Emirates Satah full field enhancement (04.07.11)
Pipelines, plus brownfield modification of existing platforms
FEED Zakum Development Company (ZADCO)
United Arab Emirates Hail Sour Gas field (04.07.11)
Platforms and pipelines
Pre-FEED (currently on hold) Abu Dhabi Gas Industries Ltd. (GASCO)
Qatar Barzan Phase 1 (04.07.11)
Platforms and pipelines
Under construction RasGas (JV of Qatar Petroleum and ExxonMobil)
United Arab Emirates Al Nasr Phase 1 (04.07.11)
Platforms and pipelines
FEED Abu Dhabi Marine Operating Company (ADMA-OPCO)
Malaysia Malikai (06.01.11)
Wellhead TLP with more than 24 slots, 24 top tension risers and 8 tendons. The 23,000 metric tonnes TLP (11,000 MT topsides and 12,000 MT hull) will handle and separate 60,000 b/d bulk liquids and 80,000 b/d of seawater treatment/injection. It will also capable of compressing 50 mmscfd of gas and export 40 mmscfd of gas. Drilling work will be by tender assisted rig.
Definition phase. Project sanction is expected in first half 2011. First oil expected in early 2014 Shell (partners: Shell 35%, ConocoPhillips 35%, PETRONAS Carigali 30%)
Malaysia Kebabangan (KBB) (06.01.11)
Single Integrated Platform with float over topsides installation designed for825 mmscf/d of gas and 80,000 b/d of oil for evacuation via two 135 km export lines to Sabah Oil and Gas Terminal (SOGT) at Kimanis. - 12,300 MT steel jacket in 140m water depth - 17,000 MT dry integrated deck comprising 12,700 MT of structural steel and 4,300MT of living Quarters, equipment and pipings Development planning and front-end engineering are underway for the KBB field.
FEED awarded to Aker Solutions. FEED started January 2009. Under this 4-year contract, estimated at USD28 million, Aker will provide detailed design and engineering support through to project´s start-up phase. KBB is now in detailed design phase. First oil is expected late 2014. Kebabangan Petroleum Operating Company (KPOC), a joint Venture between PETRONAS Carigali (40%), Shell Energy Asia (30%) and ConocoPhillips Sabah Gas Ltd (30%)
China LeDong 22-1 Subsea (16.12.09)
Subsea Gas Field tieback to fixed platform after LeDong 22-1/LeDong 15-1 fixed platform operation in September, 2009
Pre-FEED and not approval yet CNOOC
China PetroChina Nanpu project (25.06.09)
Pre-FEED  

 
 